ARCHITECTURAL REVIEW COMMITTEE

The Architectural Review Committee (ARC) reviews all plans to ensure that they comply with the Covenants of Pine Brook Hills. This includes any change to your house or property that affects its visual impact including but not limited to: new construction, additions, remodels, exterior color changes, decks, and storage sheds.

 The ARC meets at the Community Center on the second Tuesday of every month at 7 P.M.

 In order for a project to be reviewed the applicant should contact the ARC Chairman prior to the next scheduled meeting. The applicant should then plan to deliver complete documentation packages to each of the six committee members and answer a few preliminary questions at the ensuing ARC meeting. A site review is then ordered and an invitation is extended to interested neighbors for attendance at the scheduled ARC meeting in one month’s time. Upon approval of the project the committee will return one stamped and signed set for the applicant’s files and retain one stamped and signed set for the ARC files. The extra copies will also be returned to the applicant if requested.

 The following information is required in each member’s package: 

  1. A cover letter describing the project. It is also helpful to indicate whether the project has been shown to adjacent homeowners.
  2. Drawings of the project. Depending on the scope, this would include a site plan that shows the location of all structures, roads, driveways, tree removal and excavations, and elevation drawings of the proposed changes or improvements.
  3. Stake out or flag the location of the addition or modification. This will help the committee to see the actual location during the site visit.
  4. Indicate the type and color of all materials used on the exterior. Include actual samples of the colors and materials to be used. Large or bulky samples should be described in the submission package but only need to be brought to the meeting. If the proposed project will match existing colors and materials, this should be indicated. The use of dark earth tones or neutral colors is strongly recommended to minimize visual impact.
  5. Any other document or information that further explains the project is always helpful.

 A one-time, non-refundable application fee is required and is based on the size of the project. This fee should be brought to the meeting at the time the project is first reviewed. The fee schedule is as follows:

            Under 1000 sq. ft.             $50

            1000 - 3000 sq. ft.             $100

            3001 – 5000 sq. ft.            $150

            Over 5000 sq. ft.               $200

To obtain the list of ARC members or have your questions answered, please contact the ARC Chairman:

Neil Patel – 303.444.4886 or ARC@pinebrookhills.org .